The weight of the project was almost 15,000 LF of 30”-12” PVC and DIP pipe. This project included installation of 18” DIP pipe hung off the side of a bridge. Our team’s only access was from the top deck of the bridge. The project also included bore and jack at a railroad crossing and creek crossing.